New Construction of a Kindergarten in Hirrlingen
Total Area: 1030 m2
Time Frame: 2017–2020
Client: Gemeinde Hirrlingen
Building Costs: EUR 2,1 Mio
| Linear Lots | The building in wood-construction is embedded in die linear parcel structure of the area. All group rooms orient toward South and open to weather protected outdoor areas. Energy needs are covered through heat pumps and photovoltaics.
Structural Engineer: Merz Kley and Partners, Dornbirn
Landscape Architect: Siegmund and Winz, Balingen
Mechanical and Biophysics Engineer: Ebök, Tübingen
Electrical Engineer: Zeeb + Frisch, Kirchentellinsfurt
Photos: Michael Heinrich